Recently,HAPPY DOVER ship which was loaded
with BMA SR07 stacker-reclaimer left ROC Jetty makes the successful shipment of
H0921 project A sets of machine.
This stacker-reclaimer has the weight
of 1600T,stacking ability of 6000T/H, which was the first machine made for BMA.
During the performance period, RHM overcome the difficulties of harsh
technological requirement and document trace requirement. Customers issue
commendation to the excellent staff of workshops monthly to confirm the manufacturing
ability of RHM. During assembly period, the site team overcome the
high-temperature working environment to ensure the successful delivery and won
the good praise from both Sandvik and BMA.
The successful delivery showed the
indomitable Rainbow sprit and professional craftsman sprit and proved the strong
manufacturing strength and perfect management system of RHM. It also made the
company won a good reputation in the mining machinery manufacturing
circle and laid the foundation to making more equipment for BMA/BHP.
At present, the site team is working under the scorching sun for the B set to ensure the perfect delivery of early September and finally achieve perfect performance.