Final assembly bases: The three major final assembly bases have a total area of 700,000m2, suitable for the installation and commissioning of various large-scale equipment. These bases are adjacent to the shipping port, effectively reducing project periods.

    ROC Port & Final Assembly Base

    50,000t shipping berth, capable of transporting large equipment as a whole

    50,000t-level offshore vessel outfitting berth

    3,600t-level material berth

    326m shoreline

      RHP Port & Final Assembly Base

      50,000t shipping berth (water depth of 12.8m), capable of transporting large equipment as a whole

      50,000t-level offshore vessel outfitting berth

      3,600t-level material berth

      361m shoreline

        RIE Port & Final Assembly Base

        40,000t-level shipping berth

        343m shoreline

        12m water depth